
Motorola, Inc Page 11 of 24
Install the Cross Connects
If doing a hotel installation, identify the line 1 wire pair. The recommended procedure is to begin
replacing cross connects at the room termination block, moving back to the PBX termination
block. The reason is simple: In most cases, the room termination blocks are marked with room
numbers; whereas the PBX block is marked with cable pairs or PBX port IDs.
Remove and replace each line 1 wire following this recommended procedure:
1) Starting at the Room block, replace the wire termination
a) Remove the “old” wire termination (leave the rest of the “old” wire in place until step 3)
b) Punch down a new wire on the same termination
2) Connect the New termination block
a) Route the new wire pair to the Motorola block, punch down on the right side
b) Mark the block with the room number
c) Punch down a new wire pair on the left side of the block
3) At the PBX block, replace the wire termination
a) Trace the “old” wire back to its PBX termination point, removing the “old” wire as you go
b) Route the new wire from the Motorola block to the PBX block
c) Remove the “old” wire
d) Punch down the new wire on the same termination
2
1
2
3
Comentarios a estos manuales